Reference: page 24-04; 0.5 hours
The sequence of the instruction for the RV-12 airplane on page 24-04 didn't make a lot of sense to me. So while I performed all the steps I did them in a different order as I note below.
Step 2: Mark a centerline in the forward face of the Shear Clips on the tail cone.
This was my first step
Step 1: Cleco the Baggage Bulkheads to the Tailcone Assembly as shown in figure 1 on page 24-04 of the RV-12 airplane plans.
This was my second step
I got way down in the weeds on this one and forgot to take an overview picture.
Step 3: Match-drill #30 the two holes from the Baggage Bulkheads into the corresponding Shear Clips as called out in figure 1 (double check that the centerline drawn is centered in the two holes before match-drilling). Remove the bulkheads, clean and deburr holes.
This completes page 24-04 and this building session. Until next time!