Reference: pages 25-05; 5.0 hours
Step 5: Final-Drill #36 and tap 6-32 all of the match-drilled holes in the Roll Bar Frames.
It nice to see the updated plans now have the Aft window sealed against rain and fuel.But I plan never to get fuel on the window as it will craze or fog.