Tuesday, June 10, 2014

Vans Aircraft RV-12 Airplane Build, Section 49: Cooling System (part 3)

Reference for this entry: page 49-04, 49-08, 49-09, 49-10; 6.0 hours

Today's contains with work on the RV-12 airplane's engine cooling system. I am adding a Builder's Gotcha only because it took three attempts to form a gasket on the Cooler Box Door. (some of us are slow learners;) I also a m jumping over the installation of the radiator until after the heater door control is completed. Because I can't see having to work around the hoses and radiator to install the control.

Step 1: Rivet the FF-1204A Cooler Box Face and FF-1206A Cooler Box Hinge to the F-1201C Firewall Bottom using the rivets called out by Van's Aircraft. Rivet the remaining holes common between the cooler box face and the firewall bottom.



Step 2: Rivet the FF-1204B Upper Cooler Box Rib and FF-1204C Lower Cooler Box Rib to the F-1201C Firewall Bottom using the call-outs in Figure 1.



Step 3: Rivet the FF-1204A Cooler Box Face to the FF-1204B Upper Cooler Box Rib and FF-1204C Lower Cooler Box Rib using the call-outs in Figure 1.





Step 4: Use the FF-1206C Hinge Pin to attach the Cooler Box Door Assembly to the FF-1206A Cooler Box Hinge. Safety wire the hinge pin to the FF-1204B Upper Cooler Box Rib. Use the provided safety wire holes in the upper cooler box rib.

Builder's note: This was not done until after the cooler door control was finished on 6/24/14.

Step 5: Cover the F-1201C Firewall Bottom with wax beneath the Cooler Box Door Assembly.

Builder's note: OK this is the GOTCHA. I tried packing tape, I tried PVA and then I final tried wax paper. The wax paper worked great! As it allowed me to look at the seal quality and RTV flow pattern before the RTV setup. I have included pictures of the failed attempt below for entertainment and education.

Step 6: Scour the aft face of the FF-1205 Cooler Box Door with Scotch Brite around the edge where the RTV gasket is depicted in Figure 2 on page 49-04.



Step 7: Add a bead of high temp RTV around the edge of the FF-1205 Cooler Box Door as shown in Figure 2 then close the Cooler Box Door Assembly firmly agains the firewall. Temporarily hold the door closed with tape from the end of the FF-1205B Cooler Box Bracket to the edge of the fuselage.















Builder's note: Here are some of the bad attempt below.





Reference: Page 49-08

Step 1: Modify a grommet to be used for firewall penetration. Using a socket and a vise, squeeze the grommet called out in Figure 1 in page 49-08, until the socket shears through the grommet (this will be accompanied by a distinct crunching sound).



Step 2: Install the firewall grommet from Step 1 into the control cable penetration location in the F-1201A Firewall Upper.



Step 3: Install the CT A-740 BLACK Push Pull Cable into the F-1202A Instrument Panel and through the firewall grommet installed in Step 2.

Builder's note: I had to chamfer the hole to get the control cable to set flush with the panel.





Step 4: Install a cushioned clamp on the F-1202B Panel Base to support the CT A-740 BLACK Push Pull Cable.



This completes page 49-08

Reference: 49-09

Step 1: Add three sets of cushioned clamps to the WD-1220 Engine Mount Ring routing the CT A-740 BLACK Push Pull Cable through each.



Step 2: Install the friction Comb between the lower set of cushion clamps.



Step 3: Pull the handle and attached wire of the CT A-740 BLACK Push Pull Cable completely out of the cable sheath.



Step 4: Using the dimensions in Figure 1 on page 49-09, trim the CT A-740 BLACK Push Pull Cable sheath.

This completes page 49-09.

Reference: Page 49-10

Step 1: Reinsert the CT A-740 BLACK Push Pull Cable into its sheath. Close the Cooler Box Door Assembly.

Step 2: Screw the jam nut all the way onto the rod end then screw the rod end all the way into the FF-1210 Cable End as shown in Figure 1. Using the bolt called out in Figure 1 temporarily attach the rod end to the FF-1205B Cooler Box Bracket.



Step 3: Push the CT A-740 BLACK Push Pull Cable wire in, leaving a 1/16 gap between the knob and the F-1202A Instrument Panel. Mark the location of the hole in the FF-1210 Cable End on the wire. Disassemble the rod end, nut and cable end from the FF-1205B Cooler Box Bracket.




This completes this work session on the RV-12 airplane.