Friday, June 26, 2015

Vans Aircraft RV-12 Airplane Build: Final Assembly (part 2)

Reference: Page 52-03; 0.5 hours

Today's project on the RV-12 airplane was finishing the towbar assembly. Since the towbar also serves as the rudder control lock the rudder and linkages needed to be finish first.





Builder's note: I used the scrap handle rubber to cover the "feet" of the towbar.





This completes Section 52 and this entry on my RV-12 aircraft.