Reference: Page 52-03; 0.5 hours
Today's project on the RV-12 airplane was finishing the towbar assembly. Since the towbar also serves as the rudder control lock the rudder and linkages needed to be finish first.
Builder's note: I used the scrap handle rubber to cover the "feet" of the towbar.
This completes Section 52 and this entry on my RV-12 aircraft.